Project Operations & Administration · RFIs

RFI (Request for Information) Template

Quick answer

RFI (Request for Information) Template: A numbered RFI form and log to request clarifications from architects and engineers and track response times. Its format is Excel + PDF. It is for General Contractor, Subcontractor, Project Manager. It includes RFI form with drawing/spec references; RFI log with status; Days-open calculation; Cost & schedule impact flags. It is a free download from Construction Logs.

Ask design questions clearly, attach references, and track ball-in-court and days open. A clean RFI log protects your schedule and supports change order claims.

What's included

  • RFI form with drawing/spec references
  • RFI log with status
  • Days-open calculation
  • Cost & schedule impact flags
RFI (Request for Information) Template — template preview

Option 1 · Manual

Download free Excel template

Instant download. Opens in Excel, Google Sheets or Numbers.

  • ▸RFI Form
  • ▸RFI Log GEN.2Macros enabled
Recommended

Option 2 · Modern

Run live in Daily Build

Route RFIs to the right reviewer, get notified on due dates, and see ball-in-court across every project.

  • ■Fill it out from the field on any phone
  • ■Photos, signatures and timestamps attached
  • ■Automatic reports for owners and PMs
  • ■Free to start — no credit card

Quick summary

What it is
A numbered RFI form and log to request clarifications from architects and engineers and track response times.
Best for
General Contractor, Subcontractor, Project Manager
Format
Excel + PDF
Price
Free ($0.00)
Pillar
Project Operations & Administration

What's included

  • RFI form with drawing/spec references
  • RFI log with status
  • Days-open calculation
  • Cost & schedule impact flags

Template columns

RFI #Date SentSubjectSpec SectionDrawing RefQuestionAssigned ToDue DateResponseDate AnsweredCost ImpactSchedule ImpactStatus
—————————————

Excel vs. Daily Build

ExcelDaily Build
PriceFreeFree to start
Mobile field entryNoYes
Photos & attachmentsNoYes
Automatic reportsNoYes
Works offlineYesYes

FAQ

What is an RFI in construction?

A Request for Information is a formal written question to the design team to clarify drawings, specs or conditions.

How fast should an RFI be answered?

Contracts commonly require responses within 5 to 10 business days.

  • RFI vs. Submittal: What's the Difference?

    Both go to the design team, but they serve very different purposes in the contract.

  • How to Write a Daily Construction Log That Holds Up in a Dispute

    The ten fields every superintendent should record, and why consistency matters more than length.

  • How to Write an RFI (Request For Information)

    The RFI (Request for Information) form is used in construction when the contractor needs additional information on a specific process or item in the project. One of the more common circumstances that requires this is missing information or contradictions on the drawings or specifications.It is vital that the contractor has a clear understanding of what the intent from the engineer and owner are, so they can properly perform their work to the requirements. Assuming the wrong intent can lead to da