Project Management · Equipment

Equipment Log

Maintain a daily record for owned and rented equipment with asset identification, operator, hours and condition. Record inspection references and downtime so field records support equipment allocation and maintenance decisions.

Equipment Log - template preview

What's included

  • Asset and rental identification
  • Operator and operating hours
  • Inspection references
  • Downtime and condition notes

Quick answer

Equipment Log: Track equipment on site, operating hours, inspections and downtime. Its format is Excel. It is for Superintendent, Equipment Manager, General Contractor. It includes Asset and rental identification; Operator and operating hours; Inspection references; Downtime and condition notes. It is a free download from Construction Logs.

Recommended

Prefer your phone?

Run live in Daily Build

Document equipment use alongside the day's manpower and work completed in your field records.

  • ■Fill it out from the field on any phone
  • ■Photos, signatures and timestamps attached
  • ■Automatic reports for owners and PMs
  • ■Free to start - no credit card

Quick summary

What it is
Track equipment on site, operating hours, inspections and downtime.
Best for
Superintendent, Equipment Manager, General Contractor
Format
Excel
Price
Free ($0.00)
Pillar
Project Management

Template columns

DateEquipment IDEquipment TypeOwner / Rental VendorProjectOperatorMeter StartMeter EndOperating HoursInspection RefDowntimeCondition / Notes
------------

Excel vs. Daily Build

ExcelDaily Build
PriceFreeFree to start
Mobile field entryNoYes
Photos & attachmentsNoYes
Automatic reportsNoYes
Works offlineYesYes

FAQ

Should rented equipment be logged?

Yes. Record rental equipment alongside owned assets to document use, site allocation and downtime.

Is an equipment log an inspection checklist?

No. Reference the required inspections here and complete the manufacturer's and site's inspection checklists separately.

  • How To Write a Submittal Form for Construction

    Submittal forms are used by project managers to obtain approval that specific materials, equipment, qualifications and construction methods are acceptable by the owner and project engineer. This can include anything from paint colors desired on the project to the components and strength of concrete.It is important to have complete and correct submittals for the project and the contractor sends these submittals to the engineer for final acceptance. Once the submittals are accepted, the contractor

  • How to Write a Daily Construction Log That Holds Up in a Dispute

    The ten fields every superintendent should record, and why consistency matters more than length.

  • RFI vs. Submittal: What's the Difference?

    Both go to the design team, but they serve very different purposes in the contract.

Related templates